Prototype version 2 - the new frame - Page 1

Cut out these two pieces and will reuse them as shown below....

Rectangular steel tubing will be welded to these.....

The top two larger sections will act as the base for the new platform.... 

The small bottom sections will act as the base for the two batteries....

The front top support tube will also hold the receiver tube for the SegBot upright tube.....

<- Previous Page | Next Page ->

Back to "Segway Project 2012" Index Page